Lining condition assessment, holiday detection, thickness measurement, and on-site repair — extending the service life of rubber, plastic, and coating systems across operating plants.
Even the best lining systems require periodic inspection and eventual repair. Planned maintenance extends service life by decades — unplanned failure causes plant shutdowns costing millions.
Our inspection teams assess rubber linings, plastic linings, and coating systems using holiday detection, thickness measurement, hardness testing, and visual assessment.
When repair is needed, we deploy the same application teams who installed the original lining. Same procedures, same materials, same quality — whether the equipment is in our shop or at your plant.
“A scheduled inspection costs a fraction of an unplanned failure. We help you plan maintenance before the lining tells you it's too late.”
— Preventive Protection
Lining Inspection · Holiday Detection · Operating Plant
Four service categories covering the full lifecycle of corrosion protection systems.
100% surface scanning for pinholes, pores, and discontinuities. Low-voltage wet sponge and high-voltage spark methods.
Non-destructive thickness measurement, Shore A hardness, adhesion pull-off testing. Detailed condition report with recommendations.
Rubber patch vulcanisation, plastic weld repair, coating touch-up — on-site at your plant during planned shutdowns.
Emergency repair teams for unplanned failures. Temporary and permanent repair solutions to minimise downtime.
Rubber Lining · FGD Absorber
Coating System · Tank Farm
Chemical Reactor · Shutdown
Annual Inspection Program
24/7 Response · Minimise Downtime
A structured inspection and repair workflow.
Applicable inspection and test methods for each lining system.
| Method | Rubber | Plastic | Coatings | FRP |
|---|---|---|---|---|
| Holiday Detection (HV) | Primary Method | Primary Method | Primary Method | Supplementary |
| Holiday Detection (LV) | Supplementary | Supplementary | Primary Method | Not Applicable |
| Thickness Gauge | Primary Method | Primary Method | Primary Method | Primary Method |
| Shore Hardness | Primary Method | Not Applicable | Not Applicable | Not Applicable |
| Adhesion Pull-Off | Supplementary | Supplementary | Primary Method | Not Applicable |
| Barcol Hardness | Not Applicable | Not Applicable | Not Applicable | Primary Method |
Primary Method | Supplementary | Not Applicable
5-year inspection and maintenance contract for FGD absorber rubber lining at a 600MW power plant. Planned patch repairs during annual shutdowns extended lining life by 8+ years.
Schedule an inspection or request emergency repair support.